Disclaimer

This blog is for entertainment purposes only, and is not meant to teach you how to build anything. The author is not responsible for any accident, injury, or loss that occurs as a result of reading this blog. Read this blog at your own risk.

Thursday, October 18, 2012

Ch. 6 - Fuselage assembly - Part 9


F-28 installation (1.1 hrs)  

The main thing to know about F-28, is that its front face needs to be 5.9” from the front face of F-22. There is an additional change to the plans, requiring one ply of BID at 45˚ over the wooden doubler, F-22, sidewall, and upper longeron.


Pure epoxy brushed where F-28 will go

Right doubler and F-28 floxed in place

Same thing on left side

Setting F-28's proper distance from F-22

One ply of BID over the new structure

Same thing on other side, before adding epoxy.

Peel-plied and curing (I took care of the little bubble after taking this picture)

Ditto (ditto)
Next day, after peel-ply removal.

Right side done


No comments:

Post a Comment