F-28 installation (1.1 hrs)
The main thing to know about F-28, is that its front face needs to be 5.9” from the front face of F-22. There is an additional change to the plans, requiring one ply of BID at 45˚ over the wooden doubler, F-22, sidewall, and upper longeron.
 |
Pure epoxy brushed where F-28 will go |
 |
Right doubler and F-28 floxed in place |
 |
Same thing on left side |
 |
Setting F-28's proper distance from F-22 |
 |
One ply of BID over the new structure |
 |
Same thing on other side, before adding epoxy. |
 |
Peel-plied and curing (I took care of the little bubble after taking this picture) |
 |
Ditto (ditto) |
 |
Next day, after peel-ply removal. |
 |
Right side done |
No comments:
Post a Comment