Disclaimer

This blog is for entertainment purposes only, and is not meant to teach you how to build anything. The author is not responsible for any accident, injury, or loss that occurs as a result of reading this blog. Read this blog at your own risk.

Wednesday, October 17, 2012

Ch. 6 - Fuselage assembly - Part 7


Instrument panel installation (4.2 hrs)  

With the modification to the instrument panel completed, the time has come for this bulkhead to be permanently installed in the fuselage.

Nothing new here, once again I floxed the edges, located the panel, smoothed the corners with more flox, applied BID tape and peel-ply, and let it cure. 

The next morning I removed the peel-ply (and F-22) and took some finished photos.


Flox applied to instrument panel edge

Instrument panel in position

Extra flox smoothing the corner

Extra flox on all 3 other intersections, of course.

BID tape in place

Back side taped as well

BID on opposite corner

Peel-plied and curing overnight

Same thing from the back side

BID tape cured and peel-ply removed

A little sanding was necessary to remove leftover peel-ply strands

Back of instrument panel, right side.

Back of instrument panel, left side.

Instrument panel permanently installed (minus F-22, and F-28)




No comments:

Post a Comment